If you search for Pick-to-Light pricing, you’ll mostly find one thing: "Contact us for a quote." However, the question can be answered much more specifically. In this article, we break down the cost components of a Pick-to-Light system, the factors that truly drive the price, what a sample investment calculation for a picking zone looks like, and when the system pays for itself.

The short answer: Depending on the display type, hardware costs typically range between 10 and 250 euros per storage bin. However, the biggest price difference isn't in the modules themselves, but in the installation: wired systems require electrical work at every single bin. Wireless systems eliminate this entire step, which can lead to a comparatively quick return on investment. In our calculation example, this comes to around 15 to 16 months when taking the total system costs into account.

The five cost blocks of a Pick-to-Light system

The principle is explained in five steps:
  1. Hardware per compartment. The module at the storage compartment is the most visible item: from a simple LED display with a confirmation button to an ePaper display. Market prices range between 10 and 250 euros per compartment, depending on the features. The rule of thumb: the more information that needs to be displayed directly at the compartment (quantity, item, order), the higher the module price.
  2. Infrastructure and installation. This is where the market divides. Wired systems require power supply and data lines at every compartment: cable ducts, distributors, controllers, and an electrician. Depending on the shelving situation, this can quickly add up to 50 to 150 euros per compartment, plus downtime during installation. Wireless systems replace this with a few radio gateways (benchmark: approx. 1 gateway per 1000 sqm): the modules are mounted on the existing shelving and are ready for operation.
  3. Software and license. Traditionally as a one-time license with a maintenance contract, or modernly as a SaaS subscription including updates, support, and hosting. The SaaS model shifts costs from investment to operation and is important for comparing offers: it is always advisable to compare the total costs over three to five years side by side.
  4. Integration. The system must receive orders from ERP, WMS, or MES and report back confirmations. Whether this becomes a dedicated IT project or a configuration task is one of the biggest hidden price factors: custom-programmed interfaces can quickly cost a five-figure sum. Platforms with open standard interfaces (REST API, webhooks) reduce this to configuration and are ready for use in just a few hours.
  5. Introduction and operation. Process analysis, pilot setup, training, and during operation, batteries or energy, occasional module replacement, and adjustments for product range changes. The last point in particular is underestimated: with wired systems, every layout change is a new installation job.

The biggest cost lever: wired or wireless

The module prices of providers are often closer together than you might think. What really distinguishes projects is the infrastructure: in a wired system with several hundred compartments, electrical installation often accounts for 30 to 50 percent of the total investment. These are costs that simply do not apply to wireless systems. In addition, there is the question of follow-up costs: if the product range grows or the shelf layout changes, a wireless module can be moved in minutes; with a wired system, the electrician has to come back. We have described how this works in detail in our article on the benefits of Pick-to-Light.
Pick-by-Light as a wireless system

Calculation example: Picking zone with 200 compartments

A simplified example using standard market assumptions, though concrete values depend on the choice of hardware and the shelving situation:
  • Wireless system: 200 modules at €15 = €3,000, plus radio gateways and commissioning approx. €5,000 → around €8,000 investment.
  • Wired system: 200 modules at €150 = €30,000, plus electrical installation at €100 per compartment = €20,000, controller and cabling material approx. €5,000 → around €55,000, plus installation time during ongoing operations.
The difference of around 47,000 euros arises before the system has managed a single pick. Then there is the software and its maintenance: ongoing as a SaaS license or upfront as a purchase license with a maintenance contract. The key is to look at the total costs over the entire term.

When does Pick-to-Light pay off? The ROI calculation

The return comes from two sources: time saved and errors avoided. For the same example zone, calculated conservatively:
  • Time savings: Four employees pick 300 items each per day. If the light signal saves just 5 seconds per pick (studies show up to one-third time savings compared to paper lists), that is 1,200 picks × 5 seconds ≈ 100 minutes per day. At €30 in total costs per hour: around €1,100 per month.
  • Error costs: If the error rate drops from 0.3 percent to near zero, 3 to 4 picking errors are avoided per 1,200 picks daily. Even at a moderate €50 in follow-up costs per error (rework, returns, complaints), that is over €3,000 per month. In production-critical processes, where a missing part can stop the line, it is significantly more.
The time it takes for a pick-to-light system to pay for itself depends on more than just the initial costs; ongoing licensing fees, the number of workstations and the potential for operational savings also play a part.

In our sample calculation, the one-time hardware and commissioning costs of around €8,000 are offset by potential monthly savings of around €4,000. To determine actual profitability, however, ongoing costs over the system’s useful life must also be taken into account. Based on the assumptions made for this example, the system pays for itself in around 15 to 16 months.

However, the actual payback period may vary depending on the system configuration, area of application and individual savings potential.

Hidden costs: Five questions you should ask every provider

  1. What does ERP integration cost—project or configuration?
    ‍
    Custom development is the most common cost driver after the initial purchase. Even in-house development incurs significant costs.
  2. What does a layout change cost?
    ‍
    Reconfiguring shelves or expanding your product range: with wired systems, this requires a service call every time; with wireless modules, it is just a matter of moving the units.
  3. Am I locked into your hardware?
    ‍
    Hardware lock-in turns every expansion into a monopoly-priced purchase. Hardware-agnostic platforms keep competition open.
  4. What happens with new use cases?
    ‍
    If you want to add eKanban or digital labels later, you end up paying for a second system with standalone solutions. With a platform, you can simply activate the new use case based on your existing hardware.
  5. What is included in the license?
    ‍
    Updates, support, hosting—or is every item charged separately?

Start small: the pilot project

There is no need to start with 1,000 bins. A pilot project covering a single zone or line has proven to be the best approach. Wireless systems, in particular, can be set up in days rather than weeks, and the data gathered during the pilot makes the investment decision for a full rollout straightforward. This is exactly how most of our projects begin: with the plug-and-play solution from ekko on existing shelving.

Frequently asked questions about Pick-to-Light costs

What does a Pick-to-Light module cost?

Market rates range from 10 to 250 euros per storage bin—simple, dynamically updatable eInk displays (ESLs) are at the lower end, while wired, permanently powered modules are at the higher end of the spectrum.

What does the installation cost?

With wired systems, you have to factor in electrical installation costs of 25 to 150 euros per bin, depending on the shelving layout, plus the cost of controllers and cabling. Wireless systems, by contrast, only require a few radio gateways and can be mounted on the ceiling or walls without needing an electrician.

How quickly does a Pick-to-Light system pay for itself?

The payback period depends on the initial investment, ongoing licensing costs, and the actual savings potential within the specific process. Wireless systems can pay for themselves particularly quickly due to lower installation costs. However, individual circumstances should always be considered for a reliable return on investment calculation.

Can I rent Pick-to-Light instead of buying it?

Software is typically operated as a SaaS license today (including updates and support, plus hosting). License models with flexible terms increase agility, allowing you to adapt quickly to new market developments.

What does it cost to retrofit existing shelving?

For wireless modules, costs are primarily limited to the modules themselves and the associated licenses. Since they are mounted directly onto existing shelving without the need for complex electrical installations, those costs are eliminated. Ekko also offers attractive terms for higher order volumes. In contrast, retrofitting wired systems often proves to be expensive.
Would you like to know what the calculation for your order picking will look like? We’ll calculate them based on your specific processes—Straightforward and free of charge.
Send a request

Learn more about our out-of-the-box solutions

Download product overview

Technical options with ekko

Examples from our customers

Detailed ROI calculations

Download product overview

Privacy policiesImprint